image
image
image
image
image
image
image

Project: PARK ROYAL

locations: Wembley London

overall size of the project: 40m2

system: polyurethane screed

  • Food production – ready meals – short life produce.
  • Degreased and diamond ground to prepare the substrate.
  • Pumeprime DPM – DAMP PROOF EPOXY primer applied.
  • 9mm RESDEV Pumadur HF polyurethane – hand-trowelled screed laid.
  • Completed in 2 days.
image
image
image
image
image
image
image

request a quote for your project