image
image
image
image
image
image

Removing Surface Contamination & Applying Moisture Tolerant Primer Before Completing The Flooring With Durable Polyurethane Screed For Northern Bloc Ice Creams

locations: Leeds

overall size of the project: Approx 550 sqm2

system: Polyurethane screed

  • Prepare substrate via vacuum-enclosed diamond grinding to remove all surface contamination and leave a clean textured mechanical finish.
  • Apply Moisture Tolerant Primer to the entire area and blind with quartz aggregates.
  • Saw-cut anchor points to all perimeters of each individual concrete slab and the entire building area.
  • Apply nominal 9mm polyurethane screed to all areas.
  • Apply polyurethane coving materials to all wall details.
  • Recut and bring through each concrete joint and apply polyurethane jointing compound.
  • Project completed in phases over 9 days.
image
image
image
image
image
image

make an enquiry