Project: NATURAL PRODUCT THERAPY PROCESSING PLANT
locations: Ilkeston Nottingham UK
overall size of the project: approx. 120M2
system: epoxy coating system with anti-slip and walkways
- Manufacturing shop floor.
- Prepared by 3-phased planetary grinders and vacuum attached.
- Breakout to desired depth.
- Apply 1st epoxy dpm primer and allow to cure.
- Fill all minor imperfections or holes and apply 2nd epoxy primer.
- Apply 2-3mm epoxy self-smoothing screed and allow to cure
- Apply epoxy coating to various areas and lightly anti-slip.
- To re-diamond cut all joints and apply the jointing compound.
- To apply clear seals to exposed concrete aggregates.
- Completed in 4 days