Project: IPL SITTINGBOURNE

locations: Sittingbourne

overall size of the project: Approx 8,000 sqm2

specification: Polyurethane screed

  • Prepare substrate via vacuum-enclosed shot-blasting to remove all surface contamination and leave a clean textured mechanical finish.
  • Apply Moisture Tolerant Primer to the entire area and blind with quartz aggregates.
  • Saw-cut anchor points to all perimeters of each individual concrete slab and the entire building area.
  • Apply nominal 9mm polyurethane screed to all areas.
  • Recut and bring through each concrete joint and apply polyurethane jointing compound.
  • The project was completed in 25 days.