image
image
image
image

Project: INDUSTRIAL UNIT REFURBISHMENT

locations: Derby

overall size of the project: Approx 250sqm2

specification: Epoxy Self-smoothing

  • Remove all existing failed epoxy coating and prepare substrate via vacuum-enclosed diamond grinding.
  • Repair all surface Defects with epoxy repair mortar
  • Apply 1st coat of epoxy DPM primer.
  • Apply 2nd coat of epoxy DPM primer.
  • Apply 3mm epoxy self-smoothing screed.
  • Apply polyurethane jointing materials to all joints and transitions.
  • The project was completed in 4 days.
image
image
image
image

request a quote for your project