Project: HAYDOCK INDUSTRIAL REFURBISHMENT PROJECT
locations: Circa
overall size of the project: 3000m2
- Prepare floor via vacuum-enclosed shot blasting and diamond grind to all perimeter to remove all contaminants and prepare the substrate.
- Repair all surface defects and jointing via epoxy repair mortars.
- Apply 2 coats of High Build Epoxy Resin coatings.
- project completed in 7 days.