Project: DRAGON FORMULA E RACING
locations: Silverstone
overall size of the project: 400m2
system: flexible self-smoothing polyurethane screed
- Formula E – R&D training centre.
- 2 x 34mm layers of marine ply fixed at 150mm centres
- All joints banned by fibreglass mesh are incorporated with flexible primer and allowed to cure.
- 1 x water-based epoxy primer was applied to kill all porosity.
- 1 x flexible epoxy primer applied.
- 2-3mm flexible polyurethane screed laid by hand.
- 2 x coats of anti-chemical seal coats to repel against chemicals such as Skydrol.
- Completed in 8 days.