Project: BULK POWDER WASH DOWN ROOM

locations: Poland

overall size of the project: Approx 35sqm2

specification: Polyurethane screed

  • Remove all existing failed epoxy coating and prepare substrate via vacuum-enclosed diamond grinding.
  • Cut all perimeter anchor points and transitions.
  • Apply DPM primer and Polyurethane underlayment to create fall to drains.
  • Apply 9mm polyurethane screed in chosen Ral.
  • Apply Polyurethane cove details to all walls.
  • Apply polyurethane jointing compound to all joints and transitions.
  • The project was completed in 4 days.