Project: BOOTS MANUFACTURING
locations: Nottingham UK
overall size of the project: approx. 44 linear meters
system: smooth transition joint repairs
- Packing and dispatch
- Diamond cut on either side with vacuum attached.
- Breakout to desired depth.
- Bottom out with fast-curing grout up to template level.
- Once cured, fixed the sr joint and fill it with epoxy and allow it to cure.
- Once cured, to re-grind all repairs until equally smooth with all adjacent flooring.
- Apply clear seals to all over grinds and allow to cure.
- Completed in 3 days