Project: Bacon & Sausage factory
Location: Reading
Project Size: Approx 400m2
Project Specification: Polyurethane screed
- prepare substrate via vacuum-enclosed diamond grinding to remove all surface contamination and leave a clean textured mechanical finish
- Apply Moisture Tolerant Primer to the entire area and blind with quartz aggregates
- Cut all perimeter anchor points
- Apply nominal 9mm polyurethane screed to all areas
- Apply polyurethane coving render to all wall details
- Apply polyurethane jointing materials to all movement joints and drain details
- Project complete in 7 days