Project: PARK ROYAL
locations: Wembley London
overall size of the project: 40m2
system: polyurethane screed
- Food production – ready meals – short life produce.
- Degreased and diamond ground to prepare the substrate.
- Pumeprime DPM – DAMP PROOF EPOXY primer applied.
- 9mm RESDEV Pumadur HF polyurethane – hand-trowelled screed laid.
- Completed in 2 days.