Project: DRAGON FORMULA E RACING

locations: Silverstone

overall size of the project: 400m2

system: flexible self-smoothing polyurethane screed

  • Formula E – R&D training centre.
  • 2 x 34mm layers of marine ply fixed at 150mm centres
  • All joints banned by fibreglass mesh are incorporated with flexible primer and allowed to cure.
  • 1 x water-based epoxy primer was applied to kill all porosity.
  • 1 x flexible epoxy primer applied.
  • 2-3mm flexible polyurethane screed laid by hand.
  • 2 x coats of anti-chemical seal coats to repel against chemicals such as Skydrol.
  • Completed in 8 days.