Project: DILAPIDATION WORKS

locations: Industrial units Norwich area

overall size of the project: 900M2

system: industrial surface regulating screed with epoxy seal coats

  • Unoccupied industrial units.
  • Prepared by captive shot blasting and diamond grinding to edge works.
  • Epoxy DPM primer broadcast with quartz and allow to cure.
  • Polymer-modified pump screed applied at 7mm nominal
  • All expansion joints were cut and filled with 2 x part jointing compound.
  • Epoxy seal coats applied
  • Completed in 8 days.