Poultry Production Plant, South West Area GB

Full Facility Facelift – New Drains, Kerbing + A Polymer Screed Underlay Topped Off With A Hygienic & Durable 9MM Polyurethane Screed

Date: 27 March 2020

Customer Requirements

Stainless drainage and kerbing / all floors laid to falls.

Size

1360  M2, including 2 x staircases

Specification

Epoxy DPM primers. Polymer screed laid to falls, topped of with 9mm steam cleaning resistant polyurethane screed. Full resin encapsulation of stairs and landings. Joints and cove detail.


request a quote for your project

Description

This facility had seen the effects of constant use over many years. This called for a full facelift, which also included new stainless steel drains and kerbing. Followed by polymer screed underlay to be laid to falls and then finally topped of with a 9mm polyurethane screed, which gave the end-user the peace of mind to be able to steam clean their new floor creating the correct environment for their operations.